Homepage Get Maine Electrical Permit Form in PDF
Article Structure

The Maine Electrical Permit form is a crucial document for anyone looking to undertake electrical work in the state. This application is managed by the Department of Professional and Financial Regulation and is specifically designed for licensed electricians. It includes essential information such as the electrician’s name, contact details, and license number. The form also requires details about the location of the worksite, which can range from residential homes to commercial properties. A clear scope of work is necessary, as it outlines the type of electrical installations being planned, whether they involve temporary or permanent services. Additionally, the form specifies various fee structures based on the nature of the electrical work, with a minimum fee of $75. Payment options include checks or credit card information, ensuring flexibility for applicants. Furthermore, the electrician must certify the accuracy of the information provided and acknowledge their legal responsibility for compliance with relevant laws and regulations. Understanding the intricacies of this form is essential for a smooth application process and adherence to safety standards in Maine.

Dos and Don'ts

When filling out the Maine Electrical Permit form, attention to detail is crucial. Here’s a list of things to do and avoid to ensure a smooth application process.

  • Do print clearly when entering your information to avoid any misunderstandings.
  • Do double-check your license number to ensure it matches the records.
  • Do provide a complete mailing address for both the electrician and the owner.
  • Do specify the exact location of the worksite, including landmarks if necessary.
  • Do review the fee schedule carefully to select the correct fees for your project.
  • Don't forget to sign and date the application; an unsigned form may be rejected.
  • Don't use a personal check if you prefer to pay by credit card; complete the card section instead.
  • Don't leave any section blank; all fields are important for processing your permit.
  • Don't assume that the minimum fee covers all types of work; verify the costs based on your specific project.

By following these guidelines, you can help ensure that your electrical permit application is processed without unnecessary delays. Good luck with your project!

Key takeaways

Filling out the Maine Electrical Permit form correctly is essential for ensuring compliance and a smooth application process. Here are some key takeaways to keep in mind:

  • Eligibility: Only a licensed master or limited electrician can obtain an electrical permit. Ensure that you have the appropriate license before applying.
  • Accurate Information: Provide accurate details in the application. This includes your name, mailing address, and license number. Inaccuracies can lead to delays.
  • Signature Requirement: Your signature on the application certifies that the information is true and that you are responsible for compliance with all relevant laws and rules.
  • Non-Refundable Fees: Be aware that permit fees are non-refundable, with a minimum fee of $75. Plan your budget accordingly.
  • Payment Options: You can pay by check or by credit card (Mastercard or Visa). If using a card, fill out the required information carefully.
  • Scope of Work: Clearly indicate the scope of work you intend to perform. This helps in determining the correct fee and ensures that the permit covers your specific needs.
  • Fee Schedule: Familiarize yourself with the fee schedule. Different types of work have different fees, so calculate your total due accurately.
  • Worksite Location: Specify the exact location of the building worksite, including street, town/city, and county. This information is crucial for processing your application.
  • Owner Information: Include the owner's name and contact details. This is important for communication and accountability throughout the project.

By following these guidelines, you can navigate the application process more effectively and ensure that your electrical work complies with Maine's regulations.

Instructions on Filling in Maine Electrical Permit

Filling out the Maine Electrical Permit form is a straightforward process, but it’s important to ensure that all information is accurate and complete. This will help prevent delays in obtaining your permit. Once you have filled out the form, you will submit it along with the appropriate fee to the Department of Professional and Financial Regulation. Here’s how to do it step-by-step:

  1. Begin by downloading or obtaining the Maine Electrical Permit application form.
  2. In the Electrician Information section, print your name, mailing address, city, state, zip code, telephone number, and license number clearly.
  3. Sign and date the application to certify that the information is true and accurate.
  4. In the Location of Building Worksite section, specify whether it is a commercial or single-family site, and provide the street/road, town/city, county, and any landmarks to help identify the location.
  5. Next, fill out the Owner section with the owner's name, mailing address, city, state, zip code, and telephone number.
  6. Move to the Scope of Work section and check the box that corresponds to the type of work you will be doing (permanent or temporary).
  7. Fill in the quantities for the different types of work you are applying for, using the fee schedule to calculate the total cost.
  8. Ensure that the total due is at least the minimum fee of $75.00.
  9. If paying by credit card, fill out the credit card information section, including the cardholder's name, card number, expiration date, and signature.
  10. Review the entire application for accuracy before submitting it.
  11. Submit the completed form and payment to the address listed on the form: 35 State House Station, Augusta, ME 04333.

Learn More on This Form

  1. What is the purpose of the Maine Electrical Permit form?

    The Maine Electrical Permit form is used to obtain permission to perform electrical work within the state. This permit ensures that all electrical installations comply with state regulations and safety standards, protecting both the electrician and the public.

  2. Who is eligible to apply for an electrical permit?

    Only licensed master electricians or limited electricians may apply for an electrical permit in Maine. This requirement helps ensure that qualified professionals handle electrical installations, minimizing risks associated with electrical work.

  3. What are the fees associated with the electrical permit?

    The minimum fee for obtaining an electrical permit is $75.00. Additional fees may apply depending on the scope of work. For example, larger electrical systems or specific installations may incur higher fees. It is important to review the fee schedule carefully to determine the total cost.

  4. How can I pay for the electrical permit?

    Payments can be made via check, made out to the “Maine State Treasurer.” Alternatively, if you prefer to pay by credit card, you can fill out the required information on the form, including the cardholder's name, card number, and expiration date.

  5. What information do I need to provide on the application?

    The application requires detailed information, including the electrician's name, license number, contact details, and the location of the worksite. Additionally, you will need to specify the scope of work and select the appropriate fee based on the type of electrical work being performed.

  6. Is the permit fee refundable?

    No, the permit fees are non-refundable. Once the payment is submitted, it cannot be returned, regardless of whether the permit is ultimately used or not.

  7. What happens if I do not comply with the permit requirements?

    Failure to comply with the permit requirements can result in legal consequences, including fines or penalties. The electrician is responsible for ensuring that all work adheres to applicable laws and regulations. Non-compliance may also jeopardize the safety of the installation.

  8. How can I contact the Electricians’ Examining Board for more information?

    You can reach the Electricians’ Examining Board by calling (207) 624-8457 or sending a fax to (207) 624-8636. For those who are hearing impaired, a toll-free number is available at 1-888-577-6690.

File Attributes

Fact Name Description
Governing Authority The Maine Electrical Permit form is governed by the Electricians’ Examining Board under the Department of Professional & Financial Regulation.
Minimum Fee A minimum fee of $75.00 is required for all electrical permits.
Non-Refundable Fees All permit fees are non-refundable, meaning once paid, they cannot be returned.
Eligible Applicants Only licensed master or limited electricians may apply for an electrical permit.
Scope of Work The form requires a detailed description of the scope of work being performed, ensuring clarity for the project.
Payment Methods Payments can be made via check, Mastercard, or Visa, with specific instructions provided on the form.
Contact Information The form includes contact details for the Electricians’ Examining Board, including phone and fax numbers.
Location Requirement The applicant must provide the exact location of the building worksite, including street, town, and county.

Documents used along the form

The Maine Electrical Permit form is a critical document for obtaining permission to conduct electrical work in the state. Along with this form, several other documents may be required or beneficial during the permitting process. Below is a list of these documents, along with a brief description of each.

  • Electrical Plan Review Submission: This document outlines the proposed electrical work, including diagrams and specifications. It allows the reviewing authority to assess the safety and compliance of the planned installation before work begins.
  • Electrical Contractor License: A copy of the electrical contractor's license is often required to ensure that the individual or company performing the work is properly licensed and qualified under state regulations.
  • Boat Bill of Sale: For those selling or purchasing a vessel in New York, having a properly executed boat bill of sale is crucial. This document not only serves as proof of the transaction but also details the boat's specifications and the agreed sale price, ensuring a transparent transfer of ownership. For more information, you can refer to Templates and Guide.
  • Inspection Request Form: After the electrical work is completed, this form is submitted to request an inspection by the local authority. It ensures that the installation meets all safety codes and standards.
  • Certificate of Compliance: This document certifies that the completed electrical work complies with all applicable codes and regulations. It may be required for final approval and to close out the permit.

Understanding these additional documents can help streamline the permitting process and ensure compliance with state regulations. Proper preparation is essential for a successful electrical project in Maine.

Misconceptions

There are several misconceptions surrounding the Maine Electrical Permit form. Understanding these can help ensure a smooth application process. Below are four common misunderstandings:

  • Only licensed electricians can apply for a permit. Many people believe that anyone can fill out the permit application. However, it is important to note that only a licensed master or limited electrician is authorized to obtain an electrical permit in Maine.
  • The permit fee is refundable. Some applicants assume that if they change their mind or if the project does not go ahead, they can get their permit fee back. In reality, the permit fees are non-refundable, which means that once paid, the fee cannot be recovered.
  • All types of electrical work require the same fee. Many individuals think that there is a flat fee for all electrical permits. In fact, the fee varies depending on the type of work being done. For example, the cost for a temporary service is different from that for a permanent installation.
  • Payment can only be made by check. Some people believe that they must pay the permit fee using a check. However, the form allows for payment by credit card as well, making it more convenient for those who prefer that option.

Document Preview

ELECTRICAL PERMIT APPLICATION

STATE OF MAINE

DEPARTMENT OF PROFESSIONAL & FINANCIAL REGULATION OFFICE OF PROFESSIONAL & OCCUPATIONAL REGULATION

ELECTRICIANS’ EXAMINING BOARD

35 STATE HOUSE STATION

AUGUSTA, ME 04333

TEL: (207)624-8457 FAX: (207)624-8636 HEARING IMPAIRED: 1-888-577-6690 Location: 76 Northern Avenue, Gardiner, Maine

Office Use Only Check #: _______________

Amount: _______________

Cash #: ________________

Permit #: _______________

4220-1441

 

PERMIT FEES ARE NON-REFUNDABLE

 

 

MINIMUM FEE $75.00

 

 

 

 

 

 

 

ELECTRICIAN INFORMATION (PLEASE PRINT)

ONLY A LICENSED MASTER OR LIMITED ELECTRICIAN MAY OBTAIN AN ELECTRICAL PERMIT

Name

 

 

 

 

Mailing Address

 

 

 

 

City

 

State

Zip Code

Telephone

 

 

License #

 

By my signature, I hereby certify that the information provided on this application is true and accurate to the best of my knowledge and belief. By submitting this application, I understand that I am legally and professionally responsible for compliance with all laws and rules enforceable by the board with respect to the installation for which the permit is requested. Electricians’ Examining Board Rule 02-318 Chapter 135.

SIGNATURE OF ELECTRICIAN

DATE

PAYMENT OPTIONS

Make checks payable to “Maine State Treasurer” – if you wish to pay by Mastercard or Visa, fill out the following:

Name of cardholder (please print) FIRSTMIDDLE INITIAL LAST

I authorize the Department of Professional and Financial Regulation, Office of Professional & Occupational Regulation to

charge my

VISA

MASTERCARD the following amount: $_______________________

Card number: XXXX – XXXX – XXXX – XXXX

Expiration Date:

mm / yyyy

SIGNATURE

DATE

LOCATION OF BUILDING WORKSITE

 

Commercial/2-Family

Single family – temporary service only

Street/Road

 

 

 

Town/City

County

 

Landmarks (Be Specific)

 

 

 

 

 

 

 

OWNER

Name

 

 

 

Mailing Address

 

 

 

City

State

 

Zip Code

Telephone

 

 

 

(CONTINUE ON BACK)

SCOPE OF WORK

FEE SCHEDULE: - CHECK ONE:

PERMANENT

TEMPORARY

1 and 3 phase through 800 amperes

 

____ @ $75.00

$

1 and 3 phase 801 and larger

 

____ @ $85.00

$

Panels remote from the main service

 

____ @ $7.50

$

Recreational vehicle park sites

 

____ @ $7.50

$

Receptacles, switches, luminaries, electrical heating units, permanently

 

 

connected appliances and outside lighting and signs

 

____ @ $.50

$

Transformers – Not utility owned

 

____ @ $20.00

$

Motors and Generators:

 

 

 

Motors – fractional

 

____ @ $2.00

$

Motors – 1 hp and larger

 

____ @ $4.00

$

Generators (emergency, required standby, optional)

 

____ @ $30.00

$

Electrical Alarm Systems

 

____ @ $75.00

$

Energy Management Systems

 

____ @ $75.00

$

Alternative Energy Systems:

 

 

$

Photovoltaic

 

____ @ $75.00

 

Wind

 

____ @ $75.00

 

Micro-Hydro, Fuel Cell, Other

 

____ @ $75.00

 

Systems Control wiring (HVAC)

 

____ @ $75.00

$

TOTAL DUE ($75.00 MINIMUM FEE)

 

 

$